sabato 3 novembre 2012

BOEKENBERG PARK BY OMGEVING



Omgeving

Working in a historical context, of the continental Europe where the architecture of the past is still very much present, architects are often faced with the question of whether they should restore the physical or rehabilitate the conceptual.

Omgeving

This question came to the fore in response to the combined decision of the city of Antwerp and the heritage committee to rehabilitate the historical Boekenberg Park in Deurne. Within the framework of a public-private partnership, the office OMGEVING was appointed to give shape to the new ambitions of the city.

Omgeving

Based on historical analysis of the site, architects and landscape designers have proposed to approach the new development within the conceptual framework of 18th century English Garden.

Omgeving

The concept was to bring the visitor to the already narrated and carefully arranged romantic natural setting and to confront him with emotionally charged dramatic “events.”

Omgeving

Therefore the degenerated landscape had to be brought to its ideal form and 20th century concrete pool, transformed into a forest pond merging gently into its surroundings.

Omgeving

Keeping in mind that the water quality must correspond with the current health and safety regulations, it was proposed to use an ecological water treatment technology which in turn allowed for a new aquatic ecosystem to be created.

Omgeving

Meanwhile, on the opposite side of the water three pavilions emerge. Designed as a group of independent artifacts, their forms evoke images of the dramatic rock formations seen in 18th century paintings of Hans Gude or Peter Balke.

Omgeving

The gaps between them, like chasms between cliffs, gently frame the views of the old woods on the opposite side of the water. This creative reinterpretation of the history allowed the architects to take action whilst maintaining respect for a site’s history, catering to the modern standards of comfort and sustainability.

Omgeving
Omgeving 








Location: Deurne, Belgium
Architects: OMGEVING
Location: Deurne, Belgium
Year: 2012
Photographs: Courtesy of OMGEVING
source: Archdaily

PFIZER CANADA INC. SIÈGE SOCIAL BY MENKÈS SHOONER DAGENAIS LETOURNEUX ARCHITECTES


Menkès Shooner Dagenais LeTourneux Architectes

The Pfizer Canada reconfiguration project makes a very clear statement. The architectural design focuses on promoting the corporate identity of the company located on the Trans-Canada Highway.
Menkès Shooner Dagenais LeTourneux Architectes

The strategy is to use the building space in a transparent and expeditious manner through the prominence of glass in the structure in order to open the corporate headquarters to the world. To ensure a corporate image that is solidly embedded in the site, we worked around the idea of blister packs. This important feature of bio-pharmaceutical production is used as the visual key for the completion of the building facade, walls and furnishings.

Menkès Shooner Dagenais LeTourneux Architectes

The alveolate structure has been transposed to create an elegant motif displaying a variety of textures that responds to the changing light. The screen openings of the facade reproduce both the scale and the texture of the local brick, which are enriched through a wide range of colors ranging from silver to gold. The blue of the Pfizer logo is also very visible and create a recurring theme; it occurs both on the external facade and in the core of the building.

Menkès Shooner Dagenais LeTourneux Architectes

A bond is created between the industrial park, the highway, the company and the building space. Vivid and contemporary, the facades give expression to the unity of the whole. Inside, the redefinition of the site offers brand new, healthy and inspiring work spaces leading the way to a greater economic impact while attracting utmost qualified employees.

Menkès Shooner Dagenais LeTourneux Architectes

Change in culture. The occupancy ratio between common areas and closed offices went from 44/56 to 85/15. Eight hundred and sixty individual work stations have been streamlined and opened up through innovative design to increase productivity and the comfort of users. They focus on intercommunication between employees and an enhanced approach to cooperation. The interconnections are tangible: work, relaxation and service areas have been designed to innovate and optimize the sharing of ideas.

Menkès Shooner Dagenais LeTourneux Architectes

All work stations are enclosed by lateral and transversal traffic corridors to ensure fluidity and ease of movement between groups. Physical departmental barriers have been removed in order to promote the social values of the company. Access points offer the possibility of modifying group working areas, particularly in terms of workloads.

Menkès Shooner Dagenais LeTourneux Architectes

Flexible and open work areas have been developed as well as private areas, glassed conference areas with a view over the gardens and the work rooms located on the periphery of the working areas. The result of this organization is a fluid ring of traffic. The full redefinition of work functions and qualities for employee work stations ensures that employees will discover new ways to live and work.

Menkès Shooner Dagenais LeTourneux Architectes

The construction materials used, such as clear and opaque glass, aluminum and wood, reflect ambient light to create texture. The distribution and arrangement of these primary materials also highlight the multiple functions of various spaces. The entrance way to the main building offers luminous integration to the new façades which act as curtain walls. Materials were chosen not only for quality and longevity, but also for their technical features and plasticity.

Menkès Shooner Dagenais LeTourneux Architectes

The design concept is based on the enhancement and the democratic access to natural light, in order to ensure that it illuminates each work station. The floor plan made possible the generous use of windows to ensure an abundance of natural light and views.

Menkès Shooner Dagenais LeTourneux Architectes

All work areas are bright and luminous. The closed offices and conference rooms have windows and are located in the central nucleus of the building in order to benefit as much as possible from borrowed light. Thanks to an open design, most work areas have optimal access to natural light.
Menkès Shooner Dagenais LeTourneux ArchitectesMenkès Shooner Dagenais LeTourneux Architectes
Menkès Shooner Dagenais LeTourneux Architectes
Menkès Shooner Dagenais LeTourneux Architectes













Location: Kirkland, Québec, Canada
Project manager: Anik Shooner, architecte associée
Project Team: Jean-Pierre LeTourneux – architecte associé, Paolo Zasso, Julie Morin, Kristi Ante, Marlène Bourque, Marc-Antoine Chartier-Primeau, Mylène Deschênes, Shahinda Eldessouki, Pierre Gervais, Jean-François Jodoin, Vincent Lauzon, Josiane Mac, Isabel Noël, Annie Paradis, Harvens Piou, Gaétan Roy, Isabel Roy , Michel Tessier
Project leader: Anik Shooner, partner and architect
Principal designer: Jean-Pierre LeTourneux – partner and architect
Engineers: Bouthillette Parizeau et Associés, Marchand Houle et associés, SDK et Associés
Surface: 21 160 mq
Cost: 12,7 M$
Year: 2011
Client: Pfizer Canada inc.

venerdì 2 novembre 2012

SPORTS AND LEISURE BUILDING AT HIGH SCHOOL NO.3 BY MAJOR ARCHITEKCI



Major Architekci

Located in the center of Wrocław, sport and leisure building designed by Major architekci, has been  made for the nationwide competition and was awarded first prize.
Major Architekci

Main problem of the competition was to create a connection between two different schools built in the end of 19th century. High standard and multifunctionallity were first priority of competition for new building.

Major Architekci

Sport and leisure function of designed building, combined with two large lobbies between schools, affects chaotic form of  whole complex. We came up with the idea of perforated wall.

Major Architekci

With this screen, we have completed the frontage of buildings  located along Nowa Street.

Major Architekci

The screen was made with perforated Corten steel. During patinate process we‘re able to observe how the facade changes and becoming more elegant and coluorful day after day.

Major Architekci
Red color of the facade matches with old, brick-made, 19th century school and with the park area in front of the complex. Perforated screen allows the optimal insolation of the glass facade and works as a fence for street ball field located on the roof.

Major Architekci

More than that, it works as a curtain and keep the gym out of the passers-by direct sight. Interior design is minimal with a bit of industrial atmosphere.

Major Architekci

Sober interiors give us a perfect background for sport events, colorful kids activity and it doesn’t compete with the old, existing school building.

Major Architekci

The only colorful mark is vivid orange corridor connecting sports hall with changing rooms and other facilities.

Major Architekci

Except from large, multifunctional sports hall, whole complex comprise climbing wall, gym, and outdoor playing fields with running track.

Major Architekci
Major Architekci









Location: Wroclaw, Poland
Architect: Major Architekci
Project Team: Aleksandra Doniec. Joanna Omylska, Anna Owsiany, Alicja Adamowicz, Magdalena Kluz, Mariusz Borowiec, Slawomir Lazewski, Kamila Jacyniuk, Pawel Major, Joanna Nosal
Total area: 2800 sqm
Footprint area: 2 400 sqm
Gross volume: 23 587 cum
Project date: 2008-2009
Building date: 2009-2010
Investor: Zarzad Inwestycji Miejskich we Wroclawiu
Photographs: Daniel Rumiancew

EL PINAR COMMUNITY CENTER BY ROLDÁN + BERENGUÉ



Roldán + Berengué

Il distretto di Pinar si trova a circa 2 km dal villaggio di Rubi, una cittadina distante una trentina di km da Barcellona, è un complesso residenziale costruito negli anni '60 abitato da immigrati provenienti da altre città della Spagna.

Roldán + Berengué

L’isolamento fisico, dovuto alla mancanza di collegamento con la città di Ruby, e la carenza di servizi di base e delle opere di sviluppo urbano ha determinato negli ultimi anni un progressivo deterioramento del quartiere.


Roldán + Berengué

Al fine di superare una condizione potenzialmente marginale, la città di Ruby con il governo della Catalogna hanno lanciato dal 2002 un Piano di Sviluppo della Comunità (CDP), per realizzare azioni sociali e culturali per favorire la coesione economica, il senso di comunità e realizzare l'integrazione con la città.

Roldán + Berengué

Obiettivo prioritario diviene la realizzazione di un nuovo centro per la comunità che racchiuda diverse funzioni mancanti nel quartiere come l’asilo, un auditorium, spazi espositivi e una piccola palestra.

Roldán + Berengué

Nel 2007 viene bandito il concorso per la realizzazione del centro in un’area a nord del quartiere nei pressi della l'A-16 e della strada che collega Ruby con Sant Quirze del Vallès.

Roldán + Berengué

Il progetto dello studio di architettura di José Miguel Roldán e Mercè Berengué deve affrontare due aspetti determinati dal rumore provocato dalla viabilità limitrofa e dalla conformazione del terreno assegnato per l’intervento.

Roldán + Berengué

La soluzione adottata si conforma alla forte pendenza trasversale del terreno con due corpi di fabbrica a diversi livelli con un nucleo centrale dove sono collocate le funzioni di servizio.

Roldán + Berengué

Alla sinistra dell’edificio viene collocato l’auditorium con al piano superiore l’asilo nido e sulla destra, ripartiti su tre piani, la palestra, le aule didattiche,l’area espositiva ed I locali per le attività sociali gestiti da una associazione a cui aderiscono e partecipano gli abitanti del quartiere.

Roldán + Berengué

Una conformazione planimetrica che assume la forma di una farfalla con due corpi distinti e separati da un volume rientrato in corrispondenza di un piccolo percorso preesistente, mentre all’interno l’edificio ad un piano risulta arioso consentendo di accedere all’area giochi esterna.

Sul fronte strada i due corpi dell’edificio si contrappongono lasciando il lato sinistro chiuso da un muro di cinta in cemento che racchiude parte dell’auditorium mentre il lato opposto con le sue trasparenze lascia intravedere le attività che vi si svolgono, conservando nell’insieme un aspetto armonioso.

Roldán + Berengué
Roldán + Berengué









Roldán + Berengué
Roldán + Berengué 




















Location: Rubí, Spain
Project Team: Vicenç Sanz, Isis Campos, Rosa Hereu, Juanjo P. Jarque
Structure: Bernúz-Fernández
Technical Architect: Xavier Badia
Installations: Julián Passardi, Joan Escanelles
Builder: Sather
Budget: € 2.564.436
Area: 1,716 mq
Client: Promocions Urbanes de Rubí, S.A.
Year: 2011
Awards:  First Prize Competition - Community Center 2007
Photography: Jordi Surroca