Visualizzazione post con etichetta LAN Architecture. Mostra tutti i post
Visualizzazione post con etichetta LAN Architecture. Mostra tutti i post

venerdì 7 dicembre 2012

GYMNASIUM AND TOWN HALL ESPLANADE BY LAN ARCHITECTURE



LAN Architecture


In the Île-de-France region, the new gymnasium at Chelles is an exceptional example of a public building with a strong architectural identity. The town council’s aim was that this local amenity should play a key role in the harmonious redefinition of the urban landscape.


LAN Architecture


Located in the town centre, the project enhances the surrounding architectural heritage, composed of the Collège Weczerka, the Centre d’Art Contemporain “Les Églises” and the Town Hall. Respecting each edifice’s identity and acting as a link between them, it helps re-establish an aesthetic equilibrium. The reorganised esplanade was conceived as its natural extension and redefines its use as a pedestrian circulation area.


LAN Architecture


The gymnasium is an innovative example of the increasingly adoption of HEQ norms in the construction or refurbishment of public buildings. The project is the culmination of the town council’s carefully thought-out plan to transform the site into an open public space. The double-skin façade, with glass on the outside and copper-covered wood panels on the inside, creates a strong architectural identity.


LAN Architecture


The paving of the esplanade, a combination of bush-hammered concrete and large plaques of Core-ten finish concrete, echoes the walls of the gymnasium. This so-called “contextual” architecture takes into account the dense and varied environment and dynamises the setting. The glass facade amplifies perception of the surrounding space by reflecting the buildings around the square, not merely by mirroring them but by diffracting their image and creating a specific optical effect. 60% of the gymnasium’s total surface is covered with glass and copper.


LAN Architecture


The interplay of light and shade conceals the building’s framework and gives it its mineral appearance, elegance and lightness. The technical system used for the envelope is simple: a steel structure, glass façades with the lower walls in insulated concrete with copper cladding inside. This double skin ensures optimum acoustic insulation. The copper-covered wood panelling absorbs noise and reduces resonance in the large gymnasium space within.


LAN Architecture


The new esplanade was conceived as both a meeting place and a transit space, and develops the idea already sketched in by the architect Marc Barani for the Contemporary Art Centre. The subtle chequerboard arrangement of large bush-hammered and Cor-ten finish concrete slabs gives the square another dimension and highlights the entrances to the Town Hall and college.


LAN Architecture


As a natural extension of the gymnasium, the esplanade reinforces the overall impression of harmony. One of this project’s keynotes is its energy-efficient conception. Built to Very High energy Performance (VHEP) standards, the building provides a high level of user comfort. Its insulated concrete walls help cooling in summer and limit heat loss in winter. Each room also has a nocturnal double-flux ventilation system that recovers energy from the air extracted.


LAN Architecture


The façades are glazed with 2.28 m2, 44.2 “securit” panes on the outside and 8mm tempered glass on the inside, with a 14 mm anti-heat Argon gas infill. The building is connected to the town’s geothermal heating system, with a programme that heats spaces before use. The heat circulation generates the hot water and heating of the gymnasium, its annexe, changing rooms and circulation spaces.


LAN Architecture


The gymnasium is equipped with 32 photovoltaic panels with a total power of 7360 Watts, generating 6600 VA to be sold back to the national grid. The rainwater recovery system, functioning with the green roof, supplies the gymnasium’s toilets and washing facilities and provides water for its surrounding planted areas.


LAN Architecture


The infrastructure is lit naturally by large windows in the curtain wall and roof. At night, the building’s exterior is lit by LED projectors set into the ground. The entrances are indicated by candelabra. Inside, presence detectors optimise electricity management everywhere except the gymnasium space itself.


LAN ArchitectureLAN Architecture 











Location: Chelles, France

Architect: LAN Architecture

Project manager: Chelles Town Council

Area: 2200 m2

Budget: 3.85M € excl. VAT

Year: 2012

lunedì 17 settembre 2012

MARCHESINI HEADQUARTERS BY LAN ARCHITECTURE



Marchesini Group è una azienda italiana fondata nel 1974 a Pianoro, nel cuore della Packaging Valley bolognese, leader nella fornitura di linee complete e macchine per il confezionamento per le industrie farmaceutiche e cosmetiche.


Il nuovo quarter in Francia è stato realizzato dagli architetti Benoit  Jallon e Umberto Napolitano (Lan Architecture), a Saint Mesmes un piccolo centro della regione dell'Île-de-France, a circa 40 km ad est da Parigi, centro importante per la clientela di riferimento dell’azienda.


La nuova sede, che accoglie 23 persone dedicate non solo all’attività commerciale ma anche al post vendita, deve rispondere a precisi dettati logistici che ne determinano la sua architettura e l’immagine della società.


Asettico ma elegante, trasparente ma riservato, formale ma accogliente, flessibile ma definito, sono solo apparenti contraddizioni ma che sostanzialmente definiscono i principi ispiratori fondamentali che hanno motivato Lan Architecture a realizzare questa sede di circa 1000 mq. che si estende su 6 mila metri quadrati di terreno.


Il risultato è quindi un intervento di “packaging architettonico”, con volumi che si intersecano definendo spazi e funzioni preservando le linee geometriche dell’area, ovviamente orientando il lato principale, con l’ampia parete vetrata, in direzione di Parigi, di cui la sede è il riferimento commerciale.


“Uno dei volumi contiene gli spazi di lavoro flessibili, mentre l'altro racchiude un’area workshop, spazi espositivi e aree di stoccaggio. Gli uffici occupano l'area superiore del sito e sonosollevati da terra per comunicareuna sensazione di leggerezza.


L'idea era anche di cancellare distinzioni tra i diversi tipi di lavoro, evitando l'utilizzo di corridoi. Il risultato è che le aree di transizione fungano anche da ambienti nei quali le persone possano incontrarsi l'un l'altro, o come spazidi attesa con piacevole vista che si affaccia sulla campagna.


Il volume del
laboratorio si trova ad un livello inferiore e dà l'impressione di essere saldamente ancorato al terreno. L'intersezione dei due volumi funge da ingresso, con una rampa inclinata che sale all'interno dell'edificio. I prospetti e il tetto sono completamente costruitidal cemento verniciato di nero. La finitura del tetto permette diessere letto come quinto prospetto dell'edificio.”


Location: Saint Mesmes, France
Architects: LAN Architecture
Client: Marchesini Group France
Constructed Area: 1,000 mq.
Year: 2008
Photo: Jean-Marie Monthiers